Area for customer | login: password:

24.02.2012

Reduction of Drafts at Barnabe Island Pier "SP"

As per revised info divulged by Santos Dock Co., reduction of drafts of pier "SP" at Barnabe Island will be prevailing in accordance with below reviewed position:

- Pier SP (Barnabe Island terminal) = 7,70 m. (Low Tide) - 8,70 m. (High Tide).

Ps.: No matter the LOA of the vessel.

Williams (Serviços Marítimos)