Area for customer | login: password:

17.04.2012

Alemoa Terminal Pier N°3 back to normal operation.

As previously scheduled, please note Pier Nº 3 at Alemoa terminal was released today afternoon (local time) by Dock Co. after dredging works taken place over there.

Williams (Serviços Marítimos)