Area for customer | login: password:

19.09.2012

UPDATES ABOUT THE HEAVY DAMAGE OCCURRED AT SHED N. 38 - EXPORT CORRIDOR

Following our previous informative related to the above topic, according to terminal's principals, repairs on the damaged corner (nose) of their Ship loader N° 1 have already been concluded.

However, resumption of loading operations by such Ship loader i.e. N° 1 will most likely depend on the removal of the destroyed one (Ship loader N° 2) for safety reasons as planned by the terminal.

Therefore, normalization of works by Ship loader N° 1 over there still unknown.

Williams (Serviços Marítimos)