Area for customer | login: password:

13.08.2014

PIER N. 19 AT "RUMO" TERMINAL RELEASED FOR BERTHING MANEUVERS/OPERATIONS

Please note pier n. 19 at RUMO terminal was just released by local Port Captaincy + Codesp (Dock Co.) for "berthing maneuver/operations".

In view of the above, a Ship is already being called by RUMO principals to berth over there today (August 08th) afternoon LT for handling/loading cargo.

Useful to reiterate that cargo operations will flow with a single Ship loader only, for undetermined period of time yet, owing to the damages caused by the fire to the warehouses and back equipments linked to the second available Ship loader.

Keeping you duly posted!!

Dock Co.