Area for customer | login: password:

17.02.2015

MAINTENANCE AT PGL 1

Suape Dock Co. disclosed the release of the maneuvers at the PGL 1 during night time (1800hrs to 0500hrs) in a result of the last maintenance performed.

However, due to problem with the fenders in the east side of the pier, only vessels with LOA up to 170 meters are allow to berth, in a trial basis.

Suape Dock Co.