Area for customer | login: password:

28.06.2010

Removal of Rocks From The Port of Mucuripe (Fortaleza)

The deadline to complete the work to remove rocks from the sea bed of the port of Mucuripe (Fortaleza) has been reduced and instead of the original
10 months, the work should be concluded in another 15-20 days in record time.

The removal of the rocks from the sea bed is being carried out at berth 103 of the port which is used for solid bulk cargoes, especially Wheat, and the
depth will increase from 10m to 11.5m, so that ships with greater drafts can operate there.

Williams (Serviços Marítimos)